DISASSEMBLY AND ASSEMBLY ROPS GUARD REMOVAL AND INSTALLATION OF ROPS GUARD ASSEMBLY REMOVAL INSTALLATION 1. Sling ROPS guard (1) temporarily. Carry out installation in the reverse order to removal. [*1] 3 Mounting bolt: 824 – 1,030 Nm {84 – 105 kgm} 2. Remove mounting bolts (2). [*1] 3. Lift off ROPS guard (1). 4 ROPS guard: 371 kg D85EX-15 30-189 (2)