Komatsu D155AX-6 — MEASURING ENGINE SPEED

SEN00679-01 30 Testing and adjusting a The parking brake lever and work equipment lock lever may be kept in the LOCK position. a The preset mode display section (at the right bottom of the screen) can be set to [F3-R3] only while the Adjust- ment function is selected. 3) Set the work equipment lock lever in the free position and operate the ripper control lever to set the ripper lift cylinder to the raise stroke end. 4) While pressing the brake pedal securely, set the parking brake lever in the free position and set the direction of PCCS lever in the forward position.

a Before going to the next step, check that [F3] is displayed in the gear speed display section (at the right bottom of the screen). a Keep the steering system in neutral. 5) Press the decelerator pedal and set the fuel control dial in the high idle (MAX) position. 6) Return the decelerator pedal slowly to stall the torque converter with the engine at high idle. 6. Measuring torque converter stall speed 1) Start the engine and set the fuel control dial in the low idle (MIN) position. 2) Operate the shiftup (UP) switch of the PCCS lever and set the preset mode dis- play section to [F3-R3].

a The preset mode display section (at the right bottom of the screen) can be set to [F3-R3] only while the Adjust- ment function is selected. 3) While pressing the brake pedal securely, set the parking brake lever in the free position and set the direction of PCCS lever in the forward position. a Before going to the next step, check that [F3] is displayed in the gear speed display section (at the right bottom of the screen). a Keep the steering system in neutral. 4) Press the decelerator pedal and set the fuel control dial in the high idle (MAX) position. 5) Return the decelerator pedal slowly to stall the torque converter with the engine at high idle.

k Keep pressing the brake pedal se- curely and keep your right foot on the decelerator pedal for safety until the work is finished. 7) Just after the power train oil temperature gauge (T/C TEMPERATURE) indicates 118 – 120 °C, return the direction of PCCS lever to neutral. a The top of the green range of the power train oil temperature gauge indicates about 118 – 120 °C. 8) Repeat above steps 4) – 7) 3 times. 9) Perform steps 4) – 6) again, operate the ripper control lever to relieve the ripper raise system, and measure the engine speed about 5 seconds after the power train oil temperature gauge (T/C TEM- PERATURE) indicates 118 – 120 °C.

a Immediately after finishing measure- ment, return the direction of PCCS lever to neutral and lower the power train oil temperature with the engine at high idle. k Keep pressing the brake pedal se- curely and keep your right foot on the decelerator pedal for safety until the work is finished. 6) Just after the power train oil temperature gauge (T/C TEMPERATURE) indicates 118 – 120 °C, return the direction of PCCS lever to neutral. a The top of the green range of the power train oil temperature gauge indicates about 118 – 120 °C. 7) Repeat above steps 3) – 6) 3 times.

8) Perform steps 3) – 5) again and measure the engine speed about 5 seconds after the power train oil temperature gauge (T/C TEMPERATURE) indicates 118 – 120 °C. a Immediately after finishing measure- ment, return the direction of PCCS lever to neutral and lower the power train oil temperature with the engine at high idle. 7. Measuring torque converter stall + work equipment relief speed (Full stall speed) 1) Start the engine and set the fuel control dial in the low idle (MIN) position. 2) Operate the shiftup (UP) switch of the PCCS lever and set the preset mode dis- play section to [F3-R3]. 6 D155AX-6