Komatsu D155AX-6 — FAILURE CODE [DDN7KA] WEQ KNOB SW (DOWN): DISCONNECTION

SEN00719-01 40 Troubleshooting Failure code [DDN7KA] WEQ Knob Sw (down): Disconnection 1 40 D155AX-6 Action code Failure code Trouble WEQ Knob Sw (down): Disconnection (Work equipment controller system) E02 DDN7KA Contents of trouble • Signals of 2 systems of blade pitch switch circuit are turned OFF (opened) simultaneously. Action of controller • Recognizes that blade pitch switch is not pressed. Problem that appears on machine • Blade pitch function does not operate. Related information • "NO" signal of 2 systems of switch is for sensing operation and "NC" signal is for detecting error. • State of blade pitch switch signal can be checked with monitoring function. (Code:

70300 Blade Sw Input) • Method of reproducing failure code: Turn starting switch ON + Operate blade pitch switch. Possible causes and standard value in normal state Cause Standard value in normal state/Remarks on troubleshooting 1 Defective blade pitch switch (Internal disconnection) a Prepare with starting switch OFF, then carry out troubleshoot- ing without turning starting switch ON. BNSL (female) Blade pitch switch OFF (Released) ON (Pressed) Resistance between (3) – (2) Max. 1 z Min. 1 Mz Resistance between (1) – (2) Min. 1 Mz Max.

1 z 2 Disconnection in wiring har- ness (Disconnection in wiring or defective contact in con- nector) a Prepare with starting switch OFF, then carry out troubleshoot- ing without turning starting switch ON. Wiring harness between WEC2 (female) (16) – BNSL (female) (1) Resis- tance Max. 1 z Wiring harness between WEC1 (female) (4) – BNSL (female) (2) Resis- tance Max. 1 z Wiring harness between WEC2 (female) (6) – BNSL (female) (3) Resis- tance Max. 1 z 3 Hot short (Short circuit with 24V circuit) in wiring harness a Prepare with starting switch OFF, then turn starting switch ON and carry out troubleshooting.

Wiring harness between WEC2 (female) (16) – BNSL (female) (1) and chassis ground Voltage Max. 1 V Wiring harness between WEC2 (female) (6) – BNSL (female) (3) and chassis ground Voltage Max. 1 V 4 Defective work equipment controller a Prepare with starting switch OFF, then turn starting switch ON and carry out troubleshooting. WEC1, WEC2 Blade pitch switch OFF (Released) ON (Pressed) Voltage between WEC2 (6) – WEC1 (4) Max. 1 V 5 – 11 V Voltage between WEC2 (16) – WEC1 (4) 5 – 11 V Max. 1 V