OPERATION 4. Move lock lever (3) slowly to the FREE position (F), then raise the bucket from the ground. 5. Turn fuel control dial (4) to a point midway between low idling (MIN) and full speed (MAX). When the work equipment is retracted, take care that it does not interfere with the machine body or ground. 6. Move right work equipment control lever (5) slowly in the direction to pull in the bucket (D). Operate the lever to the end of its travel and hold it in position for 30 seconds. 7. Move right work equipment control lever (5) slowly in the direction to push out the bucket (C). Operate the lever to the end of its travel and hold it in position for 30 seconds. 8.
Next, move left work equipment control lever (6) slowly in the direction to pull in the arm (B). Operate the lever to the end of its travel and hold it in position for 30 seconds. 9. Move left work equipment control lever (6) slowly in the direction to push out the arm (A). Operate the lever to the end of its travel and hold it in position for 30 seconds. 10. Repeat the operation in Steps 6 to 9 for 5 minutes. 11. Check hydraulic oil temperature monitor (7) is displaying green. If the hydraulic oil temperature monitor is not displaying green (it is displaying white), repeat Steps 6 to 10 until the display is green. 12. Check to be sure engine coolant temperature monitor (1) displays green.
If it displays white, carry out additional warming up of the engine until engine water temperature monitor (1) displays green. 2-92 PC300LC/HD-7E0