Komatsu — CHECK AND ADJUST TRACK TENSION

MAINTENANCE CHECK AND ADJUST TRACK TENSION For details of starting the engine and operating the work equipment, see “STARTING THE ENGINE” on page 2-86, “WARMING UP ENGINE” on page 2-89, and “WORK EQUIPMENT OVERVIEW” on page 2-115. The wear of the pins and bushings on the undercarriage will vary with the working conditions and type of soil, so inspect the track tension frequently in order to maintain the standard tension. Stop the machine on firm, horizontal ground when carrying out the inspection and maintenance. CHECKING 1. Run the engine at low idle, move the machine forward a distance equal to the length of track on the ground, then stop the machine. 2.

Choose wooden block (3) that will reach from idler (1) to carrier roller (2), then place it on top of the track. 3. Measure the maximum deflection between the top surface of the track and the bottom surface of the wooden block. Standard deflection a = 10 to 30 mm (0.4 to 1.2 in). If the track tension is not at the standard value, adjust it in the following manner. ADJUSTMENT There is danger of plug (1) flying out under the high internal pressure of the grease. Never loosen plug (1) more than one turn. Never loosen any part other than plug (1). Never put your face in the mounting direction of plug (1).

If the track tension cannot be loosened with the procedure given here, please contact your Komatsu dis- tributor. Increasing Track Tension 1. Prepare a grease pump. PC300LC/HD-7E0 3-29