Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — WHOLE DISASSEMBLY AND WHOLE ASSEMBLY OF TRACK SHOE ASSEMBLY

50 Disassembly and assembly SEN00950-00 Whole disassembly and whole assembly of track shoe assembly 1 2. Disassembly of link 1) Set the link assembly on a link press and hit it with a hammer so that the bushing will be fitted to jaw [1]. a If the link tread, outside of the bush- ing, etc. are worn, adjust the height of jaw [1] or guide plate and align the pin and bushing with the left and right dis- assembly jig [2], [3] so that the link hole will not be damaged during dis- assembly work. a If the pin and bushing are not aligned well, the link hole may be damaged and the pin and bushing may be bro- ken during disassembly work. Special tools Whole disassembly 1.

Removal of shoe Sling the shoe assembly and set it with the shoe up on the floor and remove the shoe by using a shoe bolt impact wrench. a If a shoe bolt is not loosened after it is unscrewed by 1 turn (If its torque is not reduced to 0), loosen the other bolts first, and it will be removed smoothly. a If a shoe bolt is turned forcibly while its torque is not 0, bolt and link will adhere to each other and they will need to be repaired. a When moving the shoe assembly, take care not to damage the master link.

a If it is obliged to cut a shoe nut with gas, keep the seal temperature below 80єC to prevent thermal deterioration of the seal and take measures to prevent the spatters from entering through the clearances among the links. a Using tool R1 , drive the small plug of the pin inward after the disassembly work so that the workplace will not become dirty.

D65EX, PX, WX-15E0 5 Symbol Part number Part name Necessity Q’ty N/R Sketch R 1 791-646-7531 Remover t 1 2 791-660-7460 Brush t 1 3 791-432-1110 Push tool t 1 791-646-7550 Bar t 1 791-646-7560 Guide t 1 4 791-932-1110 Push tool t 1 791-646-7523 Bar t 1 791-646-7590 Guide t 1 5 790-701-3000 Checker t 1 6 791-432-1120 Installer t 1 7 791-601-1000 Oil pump t 1