50 Disassembly and assembly SEN00950-00 2. Links 1) Put tool R10 and spacer [1] (Outside diameter: 55 mm, Thickness: 47 mm) to the tread side of links (3) and (4). a Set tool R10 as close to the tip of the link as possible. 2) Apply hydraulic pressure slowly to the puller until the tip of the link opens 6 – 8 mm, then disconnect the link. a There is danger that the bushing will come out, so do not apply more hydraulic pressure than necessary. a If an electric pump is used, there is danger that more hydraulic pressure will be applied than necessary, so always use a hand pump. Assembly 1. Bushing Put tool R11 in contact with the end face of link (4), and press fit bushing (7).
a Bushing press fitting force: 98 – 147 kN {10 – 15 tons} a Always use a new bushing. 2. Pins 1) Using tool R3 , knock a large plug into the oil hole of pin (1). a Always use a new pin. 3) Disconnect links (5) and (6) in the same way. 2) To determine the pushing pressure when carrying out the final assembly, measure the outside diameter of the pin with a microme- ter and note down the measurement. D65EX, PX, WX-15E0 21