Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — FIELD DISASSEMBLY AND ASSEMBLY OF ONE LINK

SEN00950-00 50 Disassembly and assembly a Pin and bushing press fitting force: 245 – 343 kN {25 – 35 tons} 4) Using tool R6 , install seals (13) and (14) to links (5) and (6). a Always use new seals. a Check that there is no oil on the con- tact surface of the link and seal. 6. Connecting link 1) Finish the inside surface of the press-fit- ting hole for the pin in links (5) and (6) smoothly with sandpaper. 5) Check that there is no dirt or dust stuck to the surface of the seal or the end face of bushing (7), then coat with oil (GO140B) using a clean cloth or small brush. 6) Apply hydraulic pressure slowly to the puller until the tips of links (5) and (6) open 6 – 8 mm.

a There is danger that the bushing will come out, so do not apply more hydraulic pressure than necessary. a If an electric pump is used, there is danger that more hydraulic pressure will be applied than necessary, so always use a hand pump. 7) Operate lever block [2], align the centers of the link hole and bushing hole, and con- nect the links with tool R15 (guide pin). a Operate lever block [2] slowly and be careful not to damage the seal or get sand stuck to the seal surface. 2) Lower the track shoe assembly to the ground.

3) Set lever block [2] to the left and right link assemblies as shown in the fig, then put tool R10 and spacer [1] (outside diameter 55 mm, thickness 47 mm) in contact with the tread on links (5) and (6). a Set tool R10 as close to the tip of the link as possible. 24 D65EX, PX, WX-15E0