50 Disassembly and assembly SEN00951-00 5. Remove the mounting bolts and control valve assembly (14). 4 Control valve assembly: 120 kg Installation q Carry out installation in the reverse order to removal. q Refilling with oil Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then, check the oil level again. 5 Hydraulic tank: 55 l (EO10-DH) q Bleeding air Bleed air from the piping. For details, see Test- ing and adjusting, “Bleeding air from work equipment cylinder”. D65EX, PX, WX-15E0 3