Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — REMOVAL AND INSTALLATION OF OPERATOR'S CAB ASSEMBLY

50 Disassembly and assembly SEN00953-00 13. Lift off operator’s cab assembly (18). a Check that all the wires and pipes are dis- connected. Installation q Carry out installation in the reverse order to removal. 4 Operator’s cab assembly: 410 kg [*1] a After connecting each connector, install the grommet securely to the through hole of the cab. a When the cab is removed from the floor frame, arrange for the following sealants to retain pressurization and water-tightness when the cab is assembled again. 17A-Z11-3552...1 unit (Seal B) 17A-Z11-3541...5 units (Seal (D) – (G)) 17A-Z11-2320...2 units (C) 198-Z11-3960 Three Bond (1207B) ...1 unit (Liquid sealant (A)) D65EX, PX, WX-15E0 5