SEN00947-00 50 Disassembly and assembly 18. Remove covers (27) of the right and left steer- ing case bevel gear shafts. 21. Lift off power train unit assembly (32). [*4] a When lifting off the power train unit assembly, check that all the wires and pipes are disconnected. 4 Power train unit assembly: 1,650 kg 19. Remove right and left caps (28). Loosen clamp (29) and move seal (30) to the outside. [*3] Installation q Carry out installation in the reverse order to removal. [*1] 3 Hose clamp: 8.8 ± 0.5 Nm {90 ± 5 kgcm} [*2] 2 Mounting bolt: Liquefied adhesive (LT-2) 3 Mounting bolt: 98.1 – 122.6 Nm {10.0 – 12.5 kgm} 20. Remove 4 right and left mounting bolts (31).
[*3] a Apply the clamp all round the seal of the cou- pling securely. [*4] a When installing, take extreme care not to dam- age right and left bevel gear shaft seals (31). q Refilling with oil Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then, check the oil level again. 5 Hydraulic tank: 55 l (EO10-DH) 5 Power train case: 48 l (TO30) 4 D65EX, PX, WX-15E0