OM4048 1/08 Lubrication & Service - Section 40 Page 40-11 250 HOUR LUBRICATION AND MAINTENANCE (Continued) 8. * 9. 12. 13. 14. 15. 16. * This check is required only after the first 250 hours of operation (such as: the commissioning of a new truck, or after a new or rebuilt component installation), check: TASK COMMENTS CHECKED INITIALS MOTORIZED WHEEL GEAR CASE - Refer to the G.E. Planned Maintenance Manual and specific motorized wheel shop manual. Check for correct oil level. Lube key “C”. HYDRAULIC SYSTEM FILTERS - Replace filter ele- ments only after the initial 250 hours of operation; then at each 500 hours of operation thereafter. Check oil level. Add oil as necessary. Lube Key “B”.
BATTERIES - Check the electrolyte level and add water if necessary. BODY-UP & HOIST LIMIT SWITCHES - Check oper- ation of the switches. Clean the sensing areas of any dirt accumulation and inspect the wiring for any signs of damage. WHEEL MOTOR BLOWER (If equipped) - Grease motor blower shaft bearings. Lube key “D”. G.E. PREFILTER BLOWER (If equipped) - Add one to two applications of grease to the grease fitting. Lube key “D”. AC DRIVE BELT - Check the belt for wear or damage. Verify the belt tension is correctly set. Ensure the pulleys are aligned with each other within 3 mm (0.13 in.).
AUTOMATIC LUBE SYSTEM - Perform 250 hour checks as outlined in Automatic Lubrication System, Section 42, in this manual. FRONT WHEELS - Check the oil level. Position the fill plug at the 12 o’clock position. The floating ball in the sight gauge must be at its highest position. Add oil as necessary. Lube key E.