OM4210 Automatic Lubrication System - Section 42 Page 42-9 PREVENTIVE MAINTENANCE PROCEDURES 4. Inspect all bearing points for a bead of lubricant around the bearing seal. Use the following maintenance procedures to ensure proper system operation. It is good practice to manually lube each bear- ing point at the grease fitting provided on each Injector. This will indicate if there are any frozen or plugged bearings, and will help flush the bearings of contaminants. Daily Lubrication System Inspection 1. Check grease reservoir level. Inspect grease level height after each shift of operation. Grease usage should be consistent from day-to-day operations. 5.
System Checkout Lack of lubricant usage would indicate an inop- erative system. Excessive usage would indicate a broken supply line. a. Remove all SL-1 injector cover caps to allow visual inspection of the injector cycle indicator pins during system operation. 2. Check filter bypass indicator when filling reservoir. Replace element if bypassing. b. Start truck engine. c. Actuate override switch (6, Figure 42-1). The hydraulic motor and grease pump should operate. 3. Check all grease hoses from the SL-1 Injectors to the lubrication points. a. Repair or replace all damaged feed line hoses. d. With the grease under pressure, check each SL-1 injector assembly.
The cycle indicator pin should be retracted inside the injector body. b. Ensure that all air is purged and all new feed line hoses are filled with grease before sending the truck back into service. e. When the system attains 17,237 kPa (2500 psi), the pump should shut off and the pressure in the system should drop to zero, venting back to the grease reservoir. 4. Inspect key lubrication points for a bead of lubricant around seal. If a lubrication point appears dry, troubleshoot and repair problem. f. With the system vented, check all of the SL-1 injector indicator pins; all of the pins should be visible. Replace or repair injectors, if defective. 250 Hour Inspection 1.
Check all grease hoses from the SL-1 Injectors to the lubrication points (see Figure 42-2). a. Repair or replace all worn / broken hoses. g. Reinstall all injector cover caps. b. Ensure that all air is purged and all new feed line hoses are filled with grease before sending the truck back into service. NOTE: With the engine on, the lube system should activate within five minutes. The system should build 13,790 - 17,237 kPa (2000 - 2500 psi) within 25-40 seconds. h. Check timer operation. 2. Check all grease supply line hoses from the pump to the SL-1 injectors. a. Repair or replace all worn / broken supply lines. i. If the system is working properly, the machine is ready for operation. b.
Ensure that all air is purged and all new supply line hoses are filled with grease before sending the truck back into service. j. If the system is malfunctioning, refer to the troubleshooting chart. 3. Check grease reservoir level. a. Fill reservoir if low. Check filter bypass indicator when filling reservoir. Replace element if bypassing. 1000 Hour Inspection 1. Check pump housing oil level. Refill to bottom of level plug with SAE 10W-30 motor oil if necessary b. Check reservoir for contaminants. Clean, if required. c. Check that all filler plugs, covers and breather vents on the reservoir are intact and free of contaminants.