Kaiyi D375A-6 — A-13 Installation of operator's cab

110 Assembly process No. Installation of operator’s cab (10/18) A-13 5.12) Installation of defroster ducts for right and left doors Install left and right defroster ducts (56) and (57) with sems (58). Fig. 31 No. Part name Part No. Q'ty 56 Duct (L.H.) 198-911-9511 1 57 Duct (R.H.) 198-911-9521 1 58 Sems bolt 01024-D1230 4 No. Part name Part No. Q'ty 56 Duct (L.H.) 198-911-9511 1 57 Duct (R.H.) 198-911-9521 1 58 Sems bolt 01024-D1230 4