Kaiyi D375A-6 — A-13 Installation of operator's cab

111 Assembly process No. Installation of operator’s cab (11/18) A-13 5.13) The bundle of window washer tubes and the Fig. 20 power supply wiring harness for cab (A) in (Fig. 20) come out of the bottom of the cab left side pillar (pillar at the left door hinge) into the cab. Take them out of the cab through the hole on the floor frame (B) in (Fig. 20). 5.14) Fit the grommet of the rubber boot protecting above bundle (A) to hole (B) and connect the boot to the cab and floor frame. (Fig.

21) 5.15) Connect bundle of the window washer tubes and power supply wiring harness for cab (A) pulled out in step 5.13) to the window washer tubes and power supply wiring harness for cab installed to the machine in advance at a place out of hole (B) indicated with X-> in (Fig. 20). (Fig. 22), (Fig. 23) a The window washer tubes and power sup- ply wiring harness for cab have connector No. indicating rings at their ends as shown in (Fig. 22). Connect the tubes having the same color marks and the connectors having the same Nos. together respectively. Fig. 21