Kaiyi D375A-6 — M-1 Check and adjustment of operator's cab

143 Assembly process No. Check and adjustment of operator's cab (2/7) M-1 (2) Outlined below is a simplified method for Fig. 2 the internal pressure measurement of the operator’s cab: a) Prepare a transparent vinyl hose (of an outer diameter of 10 mm and Lock lever 3,000 mm long). mount hole b) Pour water into the hose bore for about a half of the hose length. c) Remove the sliding windshield lock lever located on the side panel of the operator’s cab to insert one end of the vinyl hose before fastening an adjacent part of the hose to the top end of the back seat using packing Fig. 3 more tape. (Fig.

5) d) Seal the gap occurring between the or lock-lever hose and the outer periph- mm ery-of the hose. 8 e) Match the water levels of the begin- Inside the ning part and the ending part of the operator's cab Outside water cloumn inside the transparent (Atmospheric pressure) vinyl hose at the outside of the oper- ator’s cab. f) Start the engine and run it at full speed to read the difference between the two water levels. (Fig. 3) Remove lock lever and insert vinyl hose. Fig. 5 a Before measuring the internal pressure, ensure that the grommets shown in Fig. 4 are fitted securely. Fig. 4 Fig. 6 Fix vinyl hose to top end of back seat • Fig. 4 is the same as Fig. 21 in "Assembly procedure A-11".

Vinyl hose Fig. 3