144 Assembly process No. Check and adjustment of operator's cab (3/7) M-1 2. Shower test for water-tightness (1) Close all the opening sections of the operator's cab. (2) Prepare to pour water of a flow of about 5 gal. (about 19 l)/min. through a water hose. (3) Pour water to the area around the hatched section in Fig. 18 for about 10 minutes. When doing this, it is not necessary to use pressurized water. (4) Pour water horizontally to the sealed surface according to the "Cross-section A-A". (Fig. 7) (5) Carefully check the area around the dashboard, in particular. a When any water leakage is found, apply due caulking before re-checking the section if the water leakage still occurs. Fig.
7 Precautions Necessary tools Necessary equipment Name Q'ty Name Q'ty Other remarks