International Trucks VT 275 — VT275 manual

UNIQUE REPAIR PROCEDURES Replacing O-Rings Before reinstalling the turbocharger, replace the oil drain O-ring and the oil supply line O-rings. TURBOCHARGER DRAIN O-RING Turbocharger Installation • Lower the Turbocharger onto the high- pressure pump cover. Install the three pump cover mounting bolts and hand- tighten. Apply anti-seize compound to the four exhaust pipe flange bolts and install hand tight with a new gasket. Loosen the crossover tube clamp and the turbine- mating clamp. The following torque procedure should be followed to assure the turbocharger parts are allowed to align correctly to the exhaust pipe assembly. First, torque the three turbocharger to pump-cover mounting bolts.

Torque Turbine Mating Clamp Second, torque the exhaust pipe assembly to the manifolds. Third, torque the exhaust pipe to EGR cooler clamp. Fourth, torque the exhaust pipe assembly to the turbocharger inlet. This procedure correctly aligns the exhaust assembly; now torque the crossover tube clamp and the turbine-mating clamp. This procedure ensures that the two turbochargers are aligned before the components are tightened. TURBINE MATING CLAMP International ® VT 275 V6 Engine 75