International Trucks VT 275 — VT275 manual

UNIQUE REPAIR PROCEDURES Cylinder Head Torque Sequence • Install new 14mm head bolts (lightly lubricated). Torque bolts 1 through 8 in sequence to 65 lb-ft (88 Nm). Torque bolts 1, 3, 5, and 7 to 85 lb-ft (116 Nm). Torque bolts 2, 4, 6, and 8 to 85 lb-ft (116 Nm). Tighten all bolts 1 through 8 in sequence 90 degrees. Tighten all bolts 1 through 8 a second time 90 degrees. Tighten all bolts numbered 1 through 8 a third time 90 degrees. Tighten all bolts 9 through 12 in sequence to 18 lb-ft. Tighten all bolts 9 through 12 in sequence to 23 lb-ft. Vibration Damper • If the vibration damper bolts are removed, they are not reusable and must be discarded.

Torque the new bolts to specifications in the proper sequence. 4 1 2 3 82 International ® VT 275 V6 Engine