Cummins — 3666003

Piston Rings C Series Page 1-106 Section 1 - Cylinder Block - Group 01 Finishing Steps Batteries can emit explosive gases. To reduce the possibility of personal injury, always ventilate the compartment before servicing the batteries. To reduce the possibility of arcing, remove the negative (-) battery cable first and attach the negative (-) battery cable last. WARNING Install the piston rings. Refer to Procedure 001-047 in Section 1. Assemble and install the piston and connecting rod assemblies. Refer to Procedure 001-054 in Section 1. Install the cylinder head. Refer to Procedure 002-004 in Section 2. Install the lubricating oil pan. Refer to Procedure 007-025 in Section 7.

Fill the engine with clean lubricating oil approved for natural gas engines. Refer to Procedure 007-037 in Section 7. Fill the low temperature aftercooler (LTA) system. Refer to Procedure 008-134 in Section 8. Fill the cooling system. Refer to Procedure 008-018 in Section 8. Connect the batteries. Refer to the OEM service manual. Open the fuel supply valve. Refer to the OEM service manual. Operate the engine and check for leaks. Piston Rings (001-047) Failure Analysis Inspection Use a new piston ring and feeler gauge to measure the side clearance of the rectangular intermediate and oil control ring grooves.

Piston Ring Side Clearance (Rectangular Grooves) mm in Intermediate Ring 0.07 MIN 0.003 0.15 MAX 0.006 Oil Control Ring 0.02 MIN 0.001 0.13 MAX 0.005