Cummins — 3666003

C Series Fuel Injection Pumps, In-Line Section 5 - Fuel System - Group 05 Page 5-23 Disengage the engine timing pin. CAUTION The governor housing must be pre-lubricated before engine operation. Failure to do so will result in premature governor wear. Remove the access plug. Add the following quantity of clean engine oil: RSV 450 ml [0.48 qt] RQV 750 ml [0.79 qt] RQVK 750 ml [0.79 qt]. Install the access plug. Torque Value: 28 N•m [ 21 ft-lb ] Remove the fuel injection pump timing pin plug. Reverse the position of the timing pin. Install the timing pin, plug, and sealing washer. Tighten the timing pin plug. Torque Value: 15 N•m [ 133 in-lb ]