MH6.6 / MH8.6 CALIBRATION 6-1 BEFORE UNDERTAKING CALIBRATION WORK Generalities In order to perform and accomplish calibration work successfully, the following requirements must be fulfilled: The pilot-control pressure must be set to 45+3 bars; measuring point M (4, Fig. 1) and setscrew (3, Fig. 1). The high pressure values of the main pumps and of the slewing pump has been checked and, if necessary, been readjusted. Presetting of the main pumps by means of the demand setscrews has been checked and, if necessary, been performed. (see also: "Meas- ures to be taken on main pump A8V") The mechanical zero positon of the slewing pump has been checked and, if necessary, been readjusted (see also:
"Measures to be taken on slewing pump A4V") Fig. 1 The area 10 m before and behind the machine not equipped with stabilizers must be barred, as the machine moves during calibration of the "Tra- velling" function. In machines equipped with stabilizers, the stabi- lizers must be used to lift the machine clear of the ground. Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual)