MH MH6.6/MH8.6 — GB COPERTINA.fm

6-2 CALIBRATION MH6.6 / MH8.6 Measures to be taken on main pump A8V Presetting of the pumps with the demand setscrews Adjustment of the setscrews and currents Pump 1 – Boom Fig. 1 Fig. 2 Extend the equipment, retract the neck cylinder, extend the stick. Objective Adapting the setscrew adjustment to the pumps and the currents of proportional valves Y241 (1, Fig. 1) and Y242 (2, Fig. 1) of the pilot-control unit in such a way that the movement in each ma- chine begins with the same high pressure. Initiate the boom raising function slowly until the demand pressure is 10 bars. The high pressure of pump 1 must be between 120 bars and 200 bars, adjust if necessary with the setscrew (1, Fig.

2) of pump 1. Prerequisites The hydraulic oil temperature at least 40 °C The pilot-control pressure set to 45 - 48 bars at high idle Pump 2 – Stick Extend the stick until it is virtually horizontal just before the limit stop. The control block has been calibrated Initiate the boom extending function slowly until the demand pressure is 10 bars. The high pres- sure of pump 2 must be between 120 bars and 200 bars, adjust, if necessary, with setscrew (2, Fig. 2) of pump 2. The power level is set to "Heavy 2" (Fine tuning of the pumps by means of the calibra- tion procedure: see calibration instructions). Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual)