MH MH6.6/MH8.6 — GB COPERTINA.fm

8-14 REPAIR INSTRUCTIONS MH6.6 / MH8.6 Depressurizing the hydraulic system / brake system Hydraulic systems may be opened only after they are depressurized. Even after a machine has been parked on a horizontal surface with its working equipment resting on the ground and with its drive drive engine shut off, there may still be a substantial amount of residual pres- sure in parts of the hydraulic sys- tem: The system comprises the following sections: - Working hydraulics - Pilot control - Service brake Depressurizing: Working hydraulics (Fig. 1) - Move all control levers after shut-down inside the precision control range.

- Primary pressure left over from the last hydraulic movements before shut-down. These activities must be planned carefully since the capacity of the pressure accumulator which now feeds the pilot-control system is limited and pressure is reduced by leakage oil losses. - Secondary pressure resulting from the excavator's own weight or from the weight of individual compo- nents of the working equipment. Secondary pressure is present until the pressure-generating compo- nents have reached a position of rest, e.g. on a mechanical support, and must therefore no longer be sustained by the hydraulic system. - Precharging pressures in the hy- draulic system induced by design constraints. Fig.

1 Residual pressure will disappear only gradually. If work on the hydraulic system is to be performed immediately after shut-down, the system must be depressurized, i.e. the pressure must be removed. Pilot control - Move the control levers several times fully into all directions. After about 30 control movements – the pressure remaining thereafter being only 2 bars – the pilot-control system can be opened. - Locate the system section to be opened. - Depressurize the system section to be opened. It may also be necessary to combine several of the measures described above. Service brake - Open the depressurized section carefully.

- Depressurize the hydraulic accumulator by de- pressing the pedal valve repeatedly. Pressure can be removed faster from the accu- mulators if minimess hoses are connected to the bleeding ports on the front and rear axles. Hold the hose ends into a collecting recipient for oil and depress the pedal valve repeatedly. Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual)