Ditch Witch RT115 Tier 2 — Backfilling

RT115 Tier 2 - SAW ATTACHMENT 129 1. Position unit at end of trench, several feet from spoils. Aim tractor at outer edge of spoils. 3. Move outer edge of spoils toward trench. Take two or more passes at spoils rather than moving all spoils at once. EMERGENCY SHUTDOWN - Turn ignition switch to STOP. 4. Repeat on other side of trench, if necessary. 5. Engage float and make final pass over trench. 2. Adjust backfill blade to fit land contour. p Backfilling OPERATION