Ditch Witch RT115 Tier 2 — Drill Pipe and Equipment

148 RT115 Tier 2 - DRILLING ATTACHMENT PREPARE JOBSITE AND EQUIPMENT 1. Assemble at least 20’ (6 m), but not more than 30’ (9 m), of drill rod. NOTICE: More than 10-15’ (3-4.5 m) of drill rod out of the trench increases the tendency of drill rod to bend. 4. Move tractor to the approach trench and align the drilling attachment with the intended bore path. 2. Install drill bit to the cutting end of the drill string. 6. Attach drill string to drilling attachment. 3. Put drill string in approach trench. Drill Pipe and Equipment p 5. Turn off engine. om0540h.eps