Ditch Witch RT115 Tier 2 — Trencher

RT115 Tier 2 - SERVICE 211 Ensure that augers are balanced, as shown. If auger timing is off, unit will bounce from side to side even in normal digging conditions. Remove bolts holding augers to auger shaft and rotate either auger as needed until augers are balanced. 15. Tighten chain by pumping EPG into grease cylinder. Reinstall bolts and tighten securely. p To adjust timing: Time Augers AS NEEDED g6jmg01h.tif