. MAINTENANCE SERVICE PROCEDURE bolts (1) loose, ORDER FOR TIGHTENING 4 - 30 CHECK AND TIGHTEN TRACK SHOE BOL I f the m achine i s u sed with track shoe b break, s o tighten an y loose bolts i they will METHOD OF TIGHTENING SHOE BOLT 1. First , tighten to t he t ightening t orque b elow, t hen check that the nut and shoe are in close contact with the link mating surface. D 85EX: 3 43 ± 39 Nm (35 ± 4 kgm, 253.2 ± 28.9 lbft) D 85PX: 5 39 ± 49 Nm (55 ± 5 kgm, 253.2 ± 28.9 lbft) 2. Afte r checking, tighten a furthe r 120° METHOD OF TIGHTENING MASTER LINK CONNECTING BOLT 1.
First tighten to a tightening torque of 343 ± 3 9 Nm (35 ± 4 kgm, 253 ± 29 lbft) then check that the link contac surface s are in clos e contact. 2. Afte r checking, tighten a furthe r 160° to 180° Tighten the bolt s in the orde r show n in th e diagr am on the r ight.