DETAILED CONTROLS AND GAUGES OPERATION 6. Install triangular cover (4) with 3 M10 bolts (3). 7. Close dirt cover (2). (For details of the method of opening and closing the cover with the lock, see Section “In Case of Engine Rear Cover and Dirt Cover (3-28)“.) This completes the operation for closing the floor. 3-36