. OPERATION OPERATION OPERATION OPERATION 3 - 116 track frame (2). As clearanc e (B) becomes larger, it can cause ways and cause the track shoe to the front idler to sway side jump off rollers. (For an ins see "ADJUST IDLER CLEA INSPECTION AND REPAIR t repair will reduce repair costs. Frequent inspection and promp The following items for inspecti on will serve as a guide to maintenance service of each undercarriage part. P erform periodical inspection and conta ct the Komatsu distributor in your area when machine has approached repairable airable limits and reversing limits. MEASURING LINK PITCH 1. 1.
Insert a wooden block betw een track shoe and sprocket to take up the slack in track shoes . 2. Measure the pitch length ( L) of 4 links at a straight portion at least 2 links from master pi n (A). Divide this measurement by four to obtain the link pitch. mm (8.0 in) g: 206 mm (8.1 in) the master link. Basic link pitch (P): 203 Link pitch limit for turnin There is no link window on REMARK The measured value under dec imal of link pitch is different from the basic value depending upon the precision of measure or the n't worn out. tolerance of product even if it is Don't judge it's worn out too so on, do it with the trend of measured value after that.