Komatsu — EVERY 2000 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING under its own weight. The pressure in the hydraulic circuit can be released. The accumulator is installed to the position shown in the diagram CHECKING FUNCTION OF ACCUMULATOR 4 - 76 The ac cumulator is c harged with high-pr essure nitrogen ga s, so mistaken operatio n may cause an explo sion, which will lead to seriou s injury or dam age. When handling the accumulator, always d o as f ollows. The pressure in th e hydraulic circuit c annot be complete ly remov ed.

W hen removing the hydraulic e quipment, do not stand in t the he direction tha t the oil spurts out when carrying out t he operation. In additi on, loosen the bolts sl owly when carrying out operation. le the accumulator. r flame or dispose of it in fire. s in it or weld it. , or subject it to any impact. Do not disassemb le the accumulator. Do not bring it nea r flame or dispose o Do not make hole s in it or weld it. Do not hit it, roll it , or subject it to any Wh en disposing o f the accumulator, t he gas must be re leased. Please contact your Komatsu distri butor to have this work car ried out. FUNCTION OF ACCUMULATOR e in the control circuit.

Even ol circuit can be operated, so he direction to lower the work The a after t the fo If t ccumulator s he engine is llowing action he control lev tores the pressur stopped, the contr s are possible. er is operated in t on th e right. Repla ce the accum ulator every 2 ye ars or every 400 0 hours, whichever c Chec k the nitrogen gas charge pres sure as follows. round. 1. S top the mach ine on firm, level g 2. O perate the pa rking brake lever to LOCK positio