. OPERATION TRANSPORTATION OPERATION TRANSPORTATION , then lift the hook posture arm, 3 - 181 5. Pass wire ropes b etween the 1st and 2nd tr ack rollers front and between the 1st and 2nd tr ack ro llers from However, for mac hines equipped wit h a ful l roller gua track roller, pass t he wire rope unde r the tr ack. 6. Set the lifting ang le (A) of the wire r ope to 30° to 40° the machine slowl 7. After the machin groun condition and the lifting posture, and then l ift slowly. Machines With Lifti In the case of machin es equipped with a lifting hook, it is possible to lift the machine as foll 1. Remove cover (1) on the top surface of the counterweight.
The lifting hook is on the inside of cover (1). 1. Remove cover (1) on the top surface of the c ounterwei lifting hook is on t he inside of cover 2. shown in the diag ram on the right. (Boo m fully rais bucket fully pulled in) set the upper s tructu re facing s the front. (Idler en 3. Set the lock lever securely to the LOCK po sition. 4. Stop the engine, c heck that the area aroun d the ope rator's cab is safe, t hen get down f rom the machine Close the cab doo r, front glass, left and rig ht doors, a nd engin e hood securely. ope. 5. Install shackles to the lifting hooks o n top of the boo m and counterweight, then fit wire r