Komatsu — LIFTING MACHINE

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 182 6. As s hown in on t he righ wire rope s that lifting po int (A) i s directly above t he cen ter of gravity ( B) ( poin t 490 m m (19.3 in) to the rea r of the sw ing center) (A): Lifting p (B): Center o f gravit (C): Swing c (D): 490 mm (19.3 i (E): Min. 8 m (26 ft 3 in (F): Min. 3.5 m (11 f t 6 in) (G): Min. 6.3 m (20 ft 8 in) 7. Whe n lifting t he machine, check t hat t here is no change in the posture of the work equipmen t caus ed by le akage of oi l from th e hydraulic circui t at the boom cylinder head en 8. Whe n the m achine come s of f th e ground, s t slowly. he lifting whe n the ma chine s tabilizes, lift i 9.

Afte r comple ting the lifting operation , alway s install cover (1) on top of the check that