hitachi — Transmission Control Valve

COMPONENT OPERATION / Drive Unit During Shift Down Condition from Forward 2nd Speed to 1st Speed [at DSS] Pressure increase of the 1st speed clutch pressure is similar to “Clutch Connection from Neutral”. Pressure decrease of the 2nd speed clutch pressure is operated reversely against pressure increase. The clutch pressure is gradually decreased by gradually decreasing the electric signal (electric current value) from the high condition. Both clutch pressures overlap by gradually increasing the 1st speed clutch pressure and gradually decreasing the 2nd speed clutch pressure. Therefore, lack of torque at shift down during digging is prevented and the operation can be done smooth.

The proportional solenoid valve and modulation spool (2) organize a set in terms of construction, and are installed to each clutch. Therefore, the best modulation pressure waveform can be always obtained by combining the pressure increase characteristics and the pressure decrease characteristics. (Refer to Clutch Oil Pressure Waveform on T3-9-32.) At End of Clutch Connection (Refer to Pressure Oil Waveform B on T3-9-32.) Finally, pressures in oil chamber (e) and oil chamber (g) become equal. Spring (3) is installed in oil chamber (g).

As the force pushing leftward of oil chamber (e) is larger than the force pushing rightward of oil chamber (g) and spring (3) force, modulation spool (2) is pushed to the left end. Therefore, oil passage (b) and oil passage (d) are completely open. (Refer to the illustration below.) Consequently, the clutch pressure and the regulator pressure become equal and constant. To Clutch Piston g 3 b e 2 d T4GD-03-09-015 1 - Modulation Spool 2 - Modulation Spring T3-9-35