Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika Putting and rough leveling of pedestals of Položenн a hrubй vyrovnбnн kozlнků ložiskovэch stojanů turbiny: turbine bearing stands Pedestals for bearing’s stands are standardly delivered as assembled with bearing stands for transport. For hanging of the bearing stands with the pedestal on a crane use exclusively the hanging pins (lugs) on the bearing stands!! Kozlнky pro ložiskovй stojany jsou standardně dodбvбny smontovanй s ložiskovэmi stojany pro dopravu.
Pro zavěšenн ložiskovйho stojanu s kozlнkem na jeřбb použнvejte vэhradně zбvěsnй čepy (nбlitky) na ložiskovэch stojanech!! · Unpack the anchor bolts with nuts and with supporting plates, wash off the preservation from the contact surfaces and from the thread ends and check their condition (turn the thread · Zбkladovй šrouby s maticemi a opěrnэmi deskami vybalit, dosedacн plochy a zбvitovй konce zbavit konzervace a kontrolovat jejich stav (protočit zбvitovй konce zбvitnicн, je -li Date: 12.11.2013 Page 124 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ HP front bearing stand pedestal / Kozlík předního VT ložiskového stojanu Drw. No. / č.v.
Tp6076030 The weight without foundation bolts / Hmotnost bez základových šroubů = 2485 kg HP rear bearing stand pedestal/ Kozlík zadního VT ložiskového stojanu Drw. No. / č.v. Tp6074949 The weight without foundation bolts / Hmotnost bez základových šroubů = 2552 kg