DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika ends by die stock if necessary). Degrease (with Technosol) the thread ends and the faces of nuts, apply the anti-sizing compound with min. temperature resistance of 120°C ( Molykote G Rapid + ) into threads and on the face of nuts. Wrap the body of each anchor bolts into the two layers of special separation tape Denso-FEU before installation (see detail instructions written in Main assembly manual ŠKODA POWER no. S12003-YK09- 05MAA-747001 chapter 4.7.6.) · Unpack the pedestal with bearing’s stands .

Dismantle the bearing stands from the pedestals, check and prepare the contact surfaces for assembly. · Cover the superstructure of the condenser (if it is not already covered). Built up the scaffolding and walk-able foot bridges for assembly of the bottom plates and nuts of the anchor bolts under the upper foundation slab, approx. 1,5 m under the slab on position. Install the handrail on the top around the openings in upper foundations slab. Carry out the safety marking of the workplace. · Grease the threads and noses of the set- screws, contact surfaces of supporting plates for the set-screws of pedestals of bearing stands.

Set-screws M52x3 for HP front bearing pedestal; M52x3 for HP rear bearing pedestal. potřeba). Odmastit (Technosol) zбvitovй konce a čela matic, nanйst protizбděrovou mazacн pastu s teplotnн odolnostн min. 120°C do zбvitů a na čela matic (např. Molykote G Rapid +). Tělo každйho zбkladovйho šroubu obalte před instalacн dvěma vrstvami speciбlnн separačnн pбsky Denso -FEU - instrukce jsou uvedeny v dokumentu „Hlavnн montбžnн manuбl ŠKODA POWER“č. S12003-YK09-05MAA-747001 chapter 4.7.6. · Vybalte kozlнky s ložiskovэmi stojany . Demontuj te ložiskovй stojany od kozlнků, kontrolujte a připravte dosedacн plochy pro montбž . · Zakryjte nбstavbu kondenzбtor u ( pokud už nenн zakryta ).

Vybudujte lešenн a pochozн lбvky pro montбž spodnнch desek a matic zбkladovэch šroubů pod hornн zбkladovou desku, cca 1,5 m pod desku na pozici. Nahoře i nstalujte zбbradlн kolem děr v hornн zбkladovй desce. Proveďte bezpečnostnн označenн pracoviště. · Nam ažte zбvity a čнpky stavěcнch šroubů, dosedacн plochy stavěcнch šroubů na podložnэch deskбch u kozlнků ložiskovэch stojanů. Stavěсн šrouby M52x3 pro přednн VT kozlнk; M52x3 pro zadnн VT kozlнk . · On a suitable place arrange the work place for getting the anchor bolts through the pedestals and for their hanging on. Build up there a scaffolding for setting of the anchor bolts pitch.

Choose the supporting area (floor or platform) so that it has enough loading capacity and that the ends of standed up anchor bolts ovehang a contiguous walk-floor. Move the anchor bolts there in vertical position, set their pitches and fix their position step by step always for one pedestal. It is recommended to modify the · Vybudujte na vhodnйm mнstě pracoviště na provlečenн a zavěšenн kotevnнch šroubů do kozlнků a instalujte zde lešenн pro nastavenн roztečн zбkladovэch šroubů. Opěrnou desku (podlaha nebo plošina) volte tak, aby měla přiměřenou nosnost a aby šrouby uloženй na vэšku vyčnнvaly 1 až 1,5m nad přilehlou pochozн podlahu.

Zavezte sem k otevnн šrouby nastojato , nastavte jejich rozteče a zajistěte jejich polohu - postupně vždy pro jeden kozlнk. Doporučeno je upravit plošin u v mнstě NT Date: 12.11.2013 Page 125 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ