DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika bolts up to approx. 30% but at the parallel time correct the altitude and leveling of pedestals by set-screws and by inserting of leveling shims under the foundation wedges, check the flatness by means of the water level and leveling instrument. Use hammering to the foundation wedges to remove any clearance. · Approximately set the mutual position of these pedestals so that the upper contact surfaces of all pedestals should be at water the level with max. altitude at +9,120 m and in all directions.

Measure the leveling with the accurate water level and optic or laser leveling instrument. Carry out the leveling by means of the inserting of shims under the supporting wedges and by changing of wedges position in the pairs. Set the pedestals in horizontal plane according to drw. no. Tp6075643 . · Place gradually all pedestals of LP casing as written above, tighten their anchor bolts approximately up to 30%, remove the clearances between the wedges and pedestals by hammering to wedges. Following preparation of the pedestal has to be done: · LP diagonal pedestals ( Tp6037878 ): assemble the bolts M42x3-1310 ( poz.20 ), M43x3-1590 (poz.

21) into the parting plane, degrease the sliding surfaces ( Technosol ), then apply the sliding varnish Molykote D 321 R and at the end the anti-sizing compound Molykote G Rapid + . Notice: Assemble the screws and transverse feathers on pedestals assemble only after the completion of LP bottom outer casing assembly . · After leveling of pedestals check the distance from upper contact surface of pedestals to the upper surface of flange of condenser’s superstructure (it has to be at least 2650 mm ). If the distance is less, it is necessary to decrease position of condenser.

· Removing of platforms from the openings for turbine casings in top foundation slab and providing of safety measures around these openings (railing). Work status: Pedestals are leveled and ready for the assembly of bottom parts of LP outer casing. kozlнků stavěcнmi šrouby a podklбdбnнm klнnovэch podložek, kontrolu rovinnosti provбdějte pomocн vodovбhy a nivelačnнho přнstroje. Doklepejte zбkladovй klнny na vymezenн vůlн. · Vyrovnejte přibližně vzбjemnou polohu všech kozlнků tak, aby hornн dosedacн plochy byly na ъrovni max. +9,120 m a ve všech směrech byly vodorovnй. Vyrovnбnн měřte přesnou vodovбhou a nivelačnнm přнstrojem.

Vyrovnбnн proveďte podklбdбnнm klнnovэch podložek a změnou polohy klнnů ve dvojici. Ustavte kozlнky v horizontбlnн rovině dle vэkresu č. Tp6075643 . · Postupně umнstěte všechny kozlнky NT tělesa , dotбhněte jejich kotevnн šrouby na cca 30%, vymezte vůle mezi klнny a kozlнky doklepбnнm klнnů . Proveďte nбsledujнcн přнpravu kozlнků: · Přнčnэ kozlнk y NT tělesa ( Tp6037878 ) do dělнсн roviny namontujte šroub M42 x3-1310 ( poz.20 ), M43x3-1590 (poz. 21) kluznй plochy odmastěte ( Technosol ), naneste kluznэ lak Molykote D321R a nakonec mazacн pastu Molykote G Rapid+ . Poznбmka: Šrouby a přнčnб pera na kozlнcнch montujte až po sestavenн spodku vnějšнho NT tělesa.

· Po vyrovnбnн kozlнků zkontrolujte vzdбlenost od hornн dosedacн plochy kozlнků na hornн plochu hrdla kondenzбtoru (musн bэt min. 265 0 mm). Pokud je vzdбlenost menšн, je nutno snнžit polohu kondenzбtoru. · Odstraňte plošiny z otvorů pro tělesa turbiny v hornн zбkladovй desce a proveďte bezpečnostnн zajištěnн těchto otvorů (zбbradlн). Stav pracн: Kozlнky jsou vyrovnбny a připraveny pro montбž spodku NT vnějšнho tělesa turbiny. Date: 12.11.2013 Page 129 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ