Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika · Unwrap the glandś bodies, wash the preservation out, check the condition of contact surfaces and mobility of sealing rings pos.15, lightly grease the contact surfaces with anti-sizing compound Molykote G Rapid+.
· Put the bottoms of gland’s bodies ( Tp6068517 ) into the transversal walls of bottom part of LP outer casing, dismantle the covers of glands (nut pos.7), turn the covers with parting plane up, take out the labyrinth’s segments, wash the preservation out, check the condition of contact surfaces, lightly grease the contact surfaces with anti-sizing compound Molykote G Rapid+). Notice: Axial position of the gland is fixed by fitting of collar with width 55h7 in groove 55H8 and 66H8 in the transversal wall of the bottom part of LP outer casing. · Vybalte tělesa ucpбvek, smyjte konzervaci, zkontrolujte stav stykovэch ploch a pohyblivost těsnнcнch kroužků poz.
15, lehce promažte kontaktnн plochy protizбděrovou pastou Molykote G Rapid+. · Vložte těles a ucpбvek ( Tp6068517 ) do přнčnэch stěn spodku NT vnějšнho tělesa, demontujte vнka těles (matice poz. 7 ), otočte vнka těles ucpбvek dělнсн rovinou vzhůru, vyjměte labyrintovй segmenty, smyjte konzervaci, zkontrolujte stav stykovэch ploch a lehce promažte kontaktnн plochy protizбděrovou pastou Molykote G Rapid+. Poznбmka: Axiбlně je poloha ucpek pevně zafixovбna uloženнm nбkružku o šнřce 55 h7 do drбž ky 55H8 a 66H8 spodku NT vnějšнho těles a Date: 12.11.2013 Page 151 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ