Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika · Hang the bodies of IPSC valves on a crane (delivered without servomotors, the weight is 11,56 tons ), turn them into the assembly position, set their level while hung on crane and move them on arranged struts; let the bodies hung on crane ropes are stretched. It is true that :
o Use the slings made of the artificial fibre · Zavěšte tělesa ST RZR ventilů na jeřбb (dopraveny bez servopohonů, hmotnost 11,56 tun ), otočte je do montбžnн polohy, vyrovnejte je při zavěšenн na jeřбbu a zavezte na připravenй vzpěry; ponechte tělesa zavěšena na jeřбbu – lana jsou v tahu. Přitom platн: o Pro zavěšenн na jeřбb použijte vazбky for the hanging on crane and gird the valve body or the pipe-sockets of valve body for connecting of the inlet and outlet steam piping (due the turning of body from transport to assembly position).
o During the turning from transporting into assembly position it is possible to support the valve bodies to their pipe-sockets for connecting the inlet and outlet steam piping; but it is necessary to avoid any damage or deformation of pipe-sockets (supporting by wooden beam). o The slings have to be placed exclusively z umělэch vlбken a opбsejte těleso ventilu, přнpadně hrdla potrubн pro připojenн přнvodu a vэstupu pбry z tělesa ventilu (pro otбčenн tělesa z dopravnн do montбžnн polohy) .
o Při otбčenн z dopravnн do montбžnн polohy, je možno tělesa ventilů opнrat o hrdla pro připojenн potrubн přнvodu a vэstupu pбry; nesmн však dojнt k poškozenн nebo deformaci hrdel (podepřenн dřevěnэm podkladem). o Vazбky musн bэt umнstěny vэhradně na tělese ventilu nebo hrdlech potrubн, vazбky se mohou dotэkat stojбnků servopohonů - nesmн je však zatěžovat, vazбky nesmн poškodit drobnй porubн . on the valve bodies or on pipe-sockets, the slings can touch the stands of servomotors, but they must not load them, slings must not damage the detail piping.
o Turning with valve bodies and the further handling can be done only by an authorized person and it can be carried out only with keeping of principles of H&S. · Attach the lids pos.9 and 8 to the bodies of IPSC valves by screws. · Check the position of bodies of IPSC valves: in axial direction the axis of steam inlet into the body of IPSC valves 4750 mm from the axis of steam inlet into IP turbine casing, the side position is determined by the distance of longitudinal axis of both bodies of IPSC valves 5300mm symmetrically from the longitudinal axis of turbine casing, the altitude position is determined in cross as position of machined surface of feet of bodies of IPSC valves.
Correct the position of valve bodies by the crane and by the turning with the upper ball journals - measure the level on bottom of pipe-sockets and on the top on flanges for the stands of CV. · Fix the position of supporting plates welding of splice-bars on as follow: o Otбčenн těles ventilů a nбslednб manipulace smн bэt provбděna pouze oprбvněnэmi osobami a bude provedena s dodrženнm zбsad BOZP . · Přišroubujte vнčka poz.9 a 8 k tělesu ST RZR. · Kontrolujte polohu těles ST RZR ventilů:
V axiбlnнm směru je osa vstupu pбry do tělesa ST RZR 4750 mm od osy vstupu pбry do ST tělesa turbiny, stranovб poloha je určena vzdбlenostн podйlnэch os obou těles ST RZR 5300mm symetricky od podйlnй osy tělesa turbiny, vэškovб poloha je určena na řezu jako poloha opracovanй plochy patek těles ST RZR. Proveďte opravu vyrovnбnн těles ventilů na pozici jeřбbem a vyšroubovбnнm hornнch kulovэch čepů – měřenн vodovбhou dole na hrdla potrubн a nahoře na přнrubě pro stojбnky RV. · Zafixujte polohu podpěrnэch desek přivařenнm přнložek nбsledovně: Date: 12.11.2013 Page 206 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ