Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika First of all it is assembly of: oil piping, steam inlet piping, gland and vent steam piping, drainage piping, crossover piping between valves bodies and turbine casings. The maximum permissible values of forces and torques on the pipe flanges are written in drawing “ Displacement and loadings of the main terminal point All main pipings in the machine hall could be assembled immediately after the erection commencement up to the intermediate points on the circumference of the concrete foundation stool.
The assembly completion from the intermediate points and sockets on turbine casings, turbine valve bodies and stator of generator can be done only after anchoring of the turbine and generator, and after their setting on right altitude & side and axial position (see the milestones of time-schedule). It is allowed to connect the piping and flange of condenser neck to the turbine casings only after the casing boxing up. Before grouting of pedestals it has to be carried out the connecting of piping ≥ DN150 and connecting of flange of condenser neck to turbine casing. Předevšнm se jednб o montбž :
olejovй ho potrubн, potrubн přнvodu pбry, potrubн ucpбvkovй a komнnkovй pбry, potrubн odvodněnн, převбděсн potrubн mezi tělesy ventil ů a tělesy turbнn y. Maximбlnн povolenй hodnoty sil a momentů na přнruby potrubн jsou uvedeny na vэkrese “Displacement and loadings of the main terminal point”. Veškerб hlavnн potrubн ve strojovně je možno montovat k mezi - bodům na obvodu zбkladovй stolice ihned po zahбjenн montбže. Dopojenн hlavnнho potrubн od mezi - bodů na hrdla těles turbiny , těles ventilů turbiny a statoru generбtoru lze provйst až po ukotvenн turbiny a generбtoru na pozici a jejich hrubйm vэškovйm, stranovйm a axiбlnнm ustavenн (viz milnнky harmonogramu).
Připojenн potrubн a hrdla kondenzбtoru na těles a turb нny je povoleno provйst až po zavřenн tělesa. Před zбlivkou kozlнků musн bэt provedeno připojenн potrubн ≥ DN150 a hrdla kondenzбtoru na těleso turbiny. Date: 12.11.2013 Page 228 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ 2.11.13 Piping assembly on the turbine / Montáž potrubí na turbíně