Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika at least 1 month before beginning of the welding on site. · Sub-supplier of assembly works has to hand over their welding documentation to DSPW supervision (technical advisory) staff for assembly on site at least 8 days before beginning of the welding on site. The documentation has to be already approved by the welding specialists in ŠKODA. Documentation for approval is required in this range: WP, WPS, WPQR and prepared forms of RLW, list of welders, certificates of the welders, list of NDT inspectors and their certificates.
· Documentation submitted before beginning of the welding has to also contain: atests of cunsumable materil for welding, list device for welding and heat treatment of welds including the revision sheets, documentation for pressure test carrying out and welds testing including modifications applied on suspensions and supports for described purpose (arrestment, reinforcement etc). Examples of the forms: · Sub- dodavatel montбžnнch služeb musн předat svoji doku mentaci svařovбnн pracovnнkům montбžnнmu dozoru (technickйho poradenstvн) DSPW na staveništi nejmйně 8 dnн před zahбjenнm svařovбnн na staveništi. Přitom dokumentace musн bэt již schvбlena specialisty pro svařovбnн ŠKODA.
Dokumentace, pro schvбlenн je požadovбna v tomto rozsahu: SP, WPS, WPQR a připravenй formulбře ZLS, seznamy svбřečů, certifikбty svбřečů, seznam pracovnнků NDT a jejich certifikбty · Dokumentace předloženб před zahбjenнm svařovбnн musн dбle obsahovat: atesty spotřebnнho materiбlu pro svařovбnн, seznam zařнzenн pro svařovбnн a tepelnй zpracovбnн svarů včetně reviznнch listů, dokumentaci provedenн tlakovэch zkoušek a kontrol svarů včetně ъprav na zбvěsech a podpěrбch provedenэch za uvedenэm ъčelem (aretace, vyztuženн atd). Přнklady formulбřů: Date: 12.11.2013 Page 271 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ