D 2011 Engine control TD 2011 W 04-04-12 ●Mount new tensioning pulley (1). ●Position setting eccentric (arrow) at 6 o'clock. ●Fasten screw (2). 1 2 6 © 47300-0 ●Press tensioning pulley (1) against the toothed belt. ●Fasten screws. 1 © 47301-0 ●Align toothed belt. Align toothed belt centrally on the toothed belt wheels. © 34132-2 © 01/2009 OBJ_DOKU-23486-001.fm 7/12