D 2011 Engine control TD 2011 W 04-04-12 ●Align toothed belt. ●Press tensioning pulley (1) against the stop. ●Turn the toothed belt wheel by hand in the direction of the arrow. The tension side (2) is tightened. 2 1 6 © 47302-2 ●Turn setting eccentric in the direction of arrow with hexagon socket. ●Bring markings (1) and bores into alignment. ●Tighten screw (2). 21 Nm 1 2 © 39605-1 ●Press tensioning pulley (1) against the stop. ●Hold toothed belt wheel (2) with counter support. ●Tighten new screw (3). Stage 1: 3 30 Nm ●Tighten new screw (3) with rotation angle disc. 2 Stage 2: 210° 1 © 39674-2 © 01/2009 OBJ_DOKU-23486-001.fm 8/12