Terex TL160 — 5.1 Operation - Loader

Working Operation 5 5 Working Operation Danger to life due to incorrectly fastened work attachments. Daily before commencing work and after every change of work attachments, a check must be carried out to ensure that the work attachment is correctly fastened, and the quick-mount hitch is properly locked. The bucket must be moved carefully at a low height. Before commencing loading work, memorize the lever controls well. During loading operations, driving and work move- ments should flow in smooth succession. P Drive slowly when familiarizing yourself with the controls. + - 00014,0 h 12 Km/h 0 4/4 1/2 5.1 Operation - Loader Switch on the work equipment (25/35).

Operation - Bucket Operate joystick (25/6). 35 Operation - additional control circuit (adjustable) + - P 00014,0 h 12 Km/h 0 4/4 1/2 Additional control circuit (25/53) in Position 1. 5 Press right-hand / left-hand push-button switch (25/5) (e. g. open/ close multi-purpose bucket). 6 Attention The additional control circuit must always be switched off unless additional equipment is operated. The hydraulic power of a number of attachments must be adjusted, e. g. rotation- al speed of sweepers, etc. Move the attachment to operating position. Operate the turning knob (25/49) to adjust hydraulic power (e. g. rotational speed). 53 49 P Fig.

25 Operating the loader 53/112 TL160 Operating Manual 12.9.08 Version 1.0