Crankcase W 03-08-03 2011 z Insert meter in measuring bridge and position the stylus with pre-tension on the ball bearing (1). z Adjust meter to "0". 6 z Move the measuring bridge and position the stylus on the ball bearing (1). z Read and note measured value. Note The difference between both measured values is max. 0.05 mm . To achieve the required tolerance shims of max. 0.5 mm may be placed under one stud bolt. z Compensate the tolerance by using shim discs (1) of suitable thickness. z Repeat the measuring process after setting. 0312 1578 - 0138 14/18 © 11/2004 1 © 33965 1 © 33965 1 1 © 33966 1 © 33966 1 1 1 © 33963 1 © 33963 1