Deutz — Deutz 2011 Workshop Manual Level 3

Fuel system W 07-07-05 2011 Order of single part assembly 1 - Shim disc 2 - Compression spring 3 - Compression bolt 4 - Adapter 5 - Injection nozzle 6 - Nozzle clamping nut z Select shim disc, for correcting the opening pressure according to the spare parts list. 6 Note A thicker disc gives a higher opening pressure. z Assemble injection valve and tighten nozzle clamping nut. 07002 z Check the injection valve on the nozzle tester again. Tightness test z Blow the injection nozzle and nozzle holder dry with air. z Press the hand lever of the tester down slowly until approx. 20 bar below the previously read opening pressure are reached.

0312 1600 - 0138 3/6 © 11/2004 6 5 4 3 2 1 © 36269 1 © 36269 1 © 36274 1 © 36274 1 © 36293 1 © 36293 1