5 Job card overview 5.2 Sorted numerically 2011 5 0312 1645 - 0138 4/6 © 11/2004 Job card Activity Maintenance group W 03-08-01 Remove and install front cover (opposite side to flywheel) Crankcase W 03-08-03 Dismantle and complete front cover (speed governor with torque adaption) Crankcase W 03-08-03 Dismantle and complete front cover (speed governor without torque adaption) Crankcase W 03-09-01 Remove and install rear cover (flywheel side) Crankcase W 03-09-04 Remove and install connection housing Crankcase W 03-11-01 Remove and install camshaft bearing, check Crankcase W 04-03-01 Renew camshaft sealing ring (opposite side to flywheel) Engine control W 04-04-11 Check engine control times Engine control W 04-04-12 Renew toothed belt and clamping roller (old version of clamping roller) Engine control W 04-04-12 Renew toothed belt and clamping roller (new version of clamping roller) Engine control W 04-05-05 Remove and install camshaft Engine control W 04-05-06 Check camshaft Engine control W 05-07-01 Remove and install speed governor Speed governing W 06-01-05 Remove and install exhaust manifold Exhaust system / Charging W 06-06-04 Remove and install turbocharger Exhaust system / Charging W 06-07-03 Remove and install air intake pipe Exhaust system / Charging W 07-02-06 Remove and install control linkage and guide bushes Fuel system W 07-02-07 Remove and install lifting magnet for start volume release Fuel system W 07-03-01 Renew injection lines Fuel system W 07-04-01 Remove and install injection pumps (Bosch) Fuel system W 07-04-01 Remove and install injection pumps (Motorpal) Fuel system W 07-06-03 Determine the thickness of the shim gasket Fuel system W 07-06-04 Check start of pumping Fuel system