. MAINTENANCE SERVICE PROCEDURE CHANGE OIL IN POWER TRAIN CASE, WASH STRAINERS(POWER TRAIN PUMP STRAINER, SCAVENGING PUMP STRAINER) WARNING 4 - 59 EVERY 1000 HOU Maintenance for ever y 250 and 500 hours should be performed a The oil is at high te operation. mperature immediately after operations, so wait for the temperature to go down before starting the The undercover is hea vy. Do not go directly under the cover when opening or closing it. Whe n removing bolts (5), carry out the operation at the rear of the point immediately under t he cover so that it is possible to escap Prepare the following Oil replacement am ount: 45 liters (11.89 US ga l) e bottom of the 1. 1.
Remove drain co ver (1) on the left side at th power train case, pull out drain hose (2) from the takeoff port, then loosen drain plug (P1) and drain the oil. oil, tighten drain plug (P1). ain plug (P1). After draining the Do not remove dr 2. Remove inspectio n cover (3) of the undercov er at the bottom rear of the machin 1) Remove 2 bolt 2) Hold down cov rear end gradu may flow out, s 3) Lower cover (3) cover is hinged The strainer ca rear of the machin e as follows. s (4) at the machine front end. 1) Remove 2 bolt s (4) at the machine front en 2) Hold down cov er (3) and remove 2 bolts (5) at the machine ally.
(Rainwater or other acc umulated water o be careful.) 3) Lower cover (3) gradually and open it. (The front side of the .) n be seen at top portion P. bolt (6) of the power train strainer, and ), then remove strainer (9). stuck to strainer (9), then wash it in clean 3. Loosen mounting remove cover (7). 4. Remove spring (8 5. Remove any dirt stuck to strainer (9), then diesel oil or flushin g oil. Wash the removed part s and the inside of the case at the same time.