Doosan DX225LC-3 — Manual (Forced) Regeneration

4. Activate regeneration switch (Figure 53) to start regeneration process. NOTE: Slight movement of the bucket (work tool) hydraulic cylinder can occur during the manual (forced) regeneration process. NOTE: Regeneration light on monitor (Figure 54) will be "ON". Engine speed will gradually increase from "LOW IDLE" to 1,800 rpm and regeneration process will then start. FG018395 Figure 53 Manual (forced) regeneration can last up to 40 minutes or more depending on amount of soot build-up. During regeneration, high temperature warning light will be "ON". When regeneration stops, regeneration and high temperature warning lights will turn "OFF". NOTE:

Operator can stop manual (forced) regeneration by raising safety lever to "UNLOCK" position. H H PM E F s DIG USB C C rpm ENTER ESC FG021740 Figure 54 Operation 3-29 DX225LC-3