During Storage Once a month, start the engine and follow the "Hydraulic Oil Warm-up" procedures listed in this manual. NOTE: Remove all seals from the machine (i.e. crankcase and hydraulic breathers, engine air intake, fuel tank vent lines, etc.). Operate hydraulic functions for traveling, swing and digging two or three times for lubrication after "Hydraulic Oil Warm-up". Coat all the moving parts and surfaces of the components with a new oil film after operating. At the same time, charge the battery. Rotate track to prevent track seizing". Every 90 days, use a hydrometer to measure the protection of the coolant.
Refer to the antifreeze/coolant protection chart to determine protection of the cooling system. Add coolant as required. After Storage Before operating the work equipment, remove all grease from the hydraulic cylinder rods. Add grease and oil at all lubrication points. Adjust fan and alternator belt tension. Connect the charged battery. Check condition of all hoses and connections. Check the levels of engine oil, fuel, coolant and hydraulic circuit oil. If there is water in the oil, change all the oil. Change all filter. Inspect for signs of nests. (i.e.
birds, rodents, etc.) When starting the engine after long-term storage, follow the "Hydraulic Oil Warm-up" procedures listed in this manual. DX225LC-3 Operation 3-78